Oasys Slope chosen for groundworks for £425 million scheme July 2018 update: In March 2017, a Welsh politician and Economy Secretary issued…
The Arup design team assessed the impact on utilities due to ground movements from a major infrastructure project. Their innovative…
Achieving the ‘Greenest Games Ever’, the Geotechnical Engineers Challenge The bid to host the 2012 Olympic and Paralympic Games included…
The Copenhagen Metro Circle Line consists of a 15.5km metro line with 17 underground stations. The stations were constructed as cut-&-cover…
The Serpentine Gallery Pavilion was designed by Frank Gehry and Arup. It was erected in Hyde Park and was open to the public for one…
A video presentation showcasing some projects that have utilised Xdisp, Pdisp and GSA.
A video presentation showcasing some projects that have utilised Slope.
Indian Institute of Technology (IIT), Bombay, have used Oasys Slope to carry out a study on the influence of soil…
Requirements Following the construction of cut and cover tunnel sections, concerns were raised by the Client about drainage pipes cast…
The widening and upgrade of 7.2km of the A470 Road, which runs along the Lledr Valley between North and South…
A video presentation showcasing some projects that have utilised Frew.
The Kowloon Canton Railway Corporation (KCRC) constructed the the 7.4km Lok Ma Chau Spurline section of the rail crossing between…
The Pinnacle was a 63 storey landmark building in London that made it past the piling stage but was halted…