Terms & Conditions

Data Security

We are committed to ensuring that your information is secure. In order to prevent unauthorised access or disclosure we have put in place suitable physical, electronic and managerial procedures to safeguard and secure the information we collect.

All data is stored in secure electronic systems accessible only to Oasys staff with both valid network login credentials and specific authorisation to access the system.  Our systems further limit data access by role to ensure data is available only to those who have a specific need to see it.

If at any point you suspect or receive a suspicious communication from someone suggesting they work for Oasys or a website claiming to be affiliated with Oasys, please forward the communication to us or report the incident by email to [email protected] or in writing to Oasys, 8 Fitzroy Street, London, UK, W1T 4BJ as soon as possible.

Data Security Notice Updated 27th February 2020

top ]


 

Website Terms and Conditions

The contents of this web site are protected by copyright and other intellectual property rights under international conventions. No copying of any words, images, graphic representations or other information contained in this web site is permitted without the prior written permission of the webmaster for this site.

Oasys accepts no responsibility for the content of any external site that links to or from this site.

top ]

 


 

Software Licensing Terms

Terms and Conditions of Purchase

The full conditions of purchase and maintenance for all Oasys desktop software are set out in the Oasys Software Licence and Support Agreement.

The full conditions of purchase and maintenance for Oasys Gofer and Oasys Giraphe are set out in the Gofer SaaS Agreement  and the Giraphe SaaS agreement.

All prices are subject to TAX at the current rate.

Prices and specifications are subject to change without notice – please ask for a written quotation.

Although every care has been taken to ensure the accuracy of all information contained herein, the contents do not form or constitute a representation, warranty, or part of any contract.

Superseded Versions of Terms and Conditions

Oasys keeps copies of all superseded versions of its terms and conditions.

Maintenance & Support Services

Support and maintenance is included with all subscription licences for their full duration.

Annual maintenance contracts are available for software under a perpetual licence, prices are based on a percentage of the most recent list price.

This service includes:

 

top ]

 


 

Cookies Policies

View available cookies policies below:

 

top ]

 

The Copenhagen Metro Circle Line

Software Used on this Project

Project Overview

The Copenhagen Metro Circle Line consists of a 15.5km metro line with 17 underground stations. The stations were constructed as cut-&-cover structures using top-down construction technique and retained within a station box of either secant piles or diaphragm walls.

The design and construction of the tunnels and stations in soft ground conditions in an urban environment posed a number of geotechnical challenges, including the requirement to limit settlements and groundwater movement.

How Oasys proved invaluable

The construction of tunnels can induce ground movements at and below the ground surface. The stations and tunnels were to be constructed in close vicinity to existing buildings and structures. These included listed buildings that date back to the 16th century which are typically built on wooden piles. These can be affected even by minor changes in the in-situ ground conditions.

In such an urban environment, building protection measures, including monitoring, settlement control and the installation of mitigation measures, were critical to the station and tunnel works. An initial assessment of building damage had been undertaken at tender design stage to assess the damage to buildings along the line of the Cityringen.

The ground conditions were 10-15m of glacial deposits over fissured limestone that included hard layers of flint. Building protection measures meant that buildings within 100m of excavations not in limestone required risk assessments for damage from movement.

Analysis

The building risk assessment process was based on a staged approach. The sequential process identified the critical buildings along the alignment using the building and geotechnical information available at tender (Stage 1). This allowed a means of scoping the extent of required protection measures and allowed a cost estimate for building protection (Stage 2).

The main stages of the building risk assessment are outlined as follows:

Stage 1

For the Stage 1 assessment a settlement analysis was done to determine the ground movements above the entire alignment of the Cityringen. The settlement analysis was done using Oasys Xdisp.

The fundamental parameter that underlies all empirical methods of estimating tunnelling settlement is the volume loss. Volume loss can be defined as the ratio of the additional volume of excavated ground removed over the theoretical volume of the tunnel. Stage 1 comprised a screening process using the ‘worst credible’ volume loss. In this stage the effects of building foundation on the pattern of settlement were ignored. Oasys XDisp was used to calculate the settlements at the ground surface caused by the construction of the tunnels.

The screening comprised the identification of any structure where the predicted settlement from bored tunnels is less than 5 mm and the predicted slope is less than 1/500. These did not need be subject to further assessment. All other structures shall be subjected to a Stage 2 risk assessment.

Stage 2

For the Stage 2 assessment all the structures identified in Stage 1 and subject to settlements were assessed using a limiting tensile strain approach (Burland et al. 1977; Burland 1995; Mair et al. 1996; Burland and Boscardin and Cording 1989). This method took into account the tensile strains in the ground and used a simple idealised model of the building. The Stage 2 risk assessment assumed that the buildings followed the greenfield surface settlement profile calculated in Stage 1 and again was undertaken using the Oasys Xdisp programme.

The damage category of the building was determined in accordance with the limiting tensile strange ranges as shown below.

Xdisp was able to show how these specific structures performed in relation to the damage categories using building damage interaction charts as shown below.

Furthermore, the displacements along the sub-structure were plotted using Xdisp.

From the Stage 2 assessment a list of identified buildings with special concerns, or listed buildings with a damage category greater than 1 for ‘worst’ case volume loss, or a normal building with a damage category greater than 2, were compiled. At tender stage this list was used to identify buildings where building protection may be required, allowing a means of assessing the contractor’s proposed works during tender evaluation.

Controlling ground movements

In glacial deposits, and especially in zones with mixed faces, additional measures were required to keep the surface settlements at an acceptable level. Settlements caused by tunnelling were mitigated by:

  • Alignment optimisation
  • TBM design
  • TBM operational management
  • Monitoring and systematic early follow-up
  • Soil improvement, structural strengthening, compensation grouting, permeation grouting, freezing, temporary bracings etc, and
  • Construction of lateral and superior barriers (e.g. piling, pipe roofing etc) 

References

S. Eksesn, D. Whittles, J. Krogh and J. Gravgaard, The Copenhagen Metro Circle Line –Tunneling and Station Construction Challenges in Urban Conditions, presented at the Rapid Excavation and Tunneling Conference, San Francisco, California, June 2011

Credits

What is your query?

  • This field is for validation purposes and should be left unchanged.

Newsletter Sign up

Please fill out your details below to receive the latest oasys news.

  • This field is for validation purposes and should be left unchanged.