Terms & Conditions

Data Security

We are committed to ensuring that your information is secure. In order to prevent unauthorised access or disclosure we have put in place suitable physical, electronic and managerial procedures to safeguard and secure the information we collect.

All data is stored in secure electronic systems accessible only to Oasys staff with both valid network login credentials and specific authorisation to access the system.  Our systems further limit data access by role to ensure data is available only to those who have a specific need to see it.

If at any point you suspect or receive a suspicious communication from someone suggesting they work for Oasys or a website claiming to be affiliated with Oasys, please forward the communication to us or report the incident by email to [email protected] or in writing to Oasys, 8 Fitzroy Street, London, UK, W1T 4BJ as soon as possible.

Data Security Notice Updated 27th February 2020

top ]


 

Website Terms and Conditions

The contents of this web site are protected by copyright and other intellectual property rights under international conventions. No copying of any words, images, graphic representations or other information contained in this web site is permitted without the prior written permission of the webmaster for this site.

Oasys accepts no responsibility for the content of any external site that links to or from this site.

top ]

 


 

Software Licensing Terms

Terms and Conditions of Purchase

The full conditions of purchase and maintenance for all Oasys desktop software are set out in the Oasys Software Licence and Support Agreement.

The full conditions of purchase and maintenance for Oasys Gofer and Oasys Giraphe are set out in the Gofer SaaS Agreement  and the Giraphe SaaS agreement.

All prices are subject to TAX at the current rate.

Prices and specifications are subject to change without notice – please ask for a written quotation.

Although every care has been taken to ensure the accuracy of all information contained herein, the contents do not form or constitute a representation, warranty, or part of any contract.

Superseded Versions of Terms and Conditions

Oasys keeps copies of all superseded versions of its terms and conditions.

Maintenance & Support Services

Support and maintenance is included with all subscription licences for their full duration.

Annual maintenance contracts are available for software under a perpetual licence, prices are based on a percentage of the most recent list price.

This service includes:

 

top ]

 


 

Cookies Policies

View available cookies policies below:

 

top ]

 

Case Studies

Oasys Software has been used on thousands of interesting and exciting projects over the years. We would love to tell about all of them, but the confidentiality of our clients and their clients is paramount. We are especially grateful then to our clients who have taken the trouble to secure the required permissions and created the case studies below.

Structural analysis and design of a bamboo art installation using Oasys GSA

The Heartburst project involved a unique art installation displayed at a festival in the United States (US) back in August…

Read More
King’s Cross station redevelopment – roof analysis and design using Oasys GSA

King’s Cross station is London’s busiest transport hub. Arup played a huge part in the redevelopment of the mainline station…

Read More
Las Vegas High Roller observation wheel – intricate analysis and design using Oasys GSA

The Las Vegas High Roller opened in 2014 as the largest observation wheel in the world (it is now the…

Read More
Structural assessment of the Barlow train shed, London St. Pancras International using Oasys GSA

St. Pancras International is a central London railway station on Euston Road in the London Borough of Camden. For a…

Read More
Major structural upgrade to award-winning sporting venue using Oasys GSA: Ken Rosewall Arena, Sydney.

Also known as the Sydney Tennis Centre, the Ken Rosewall Arena is a multi-award-winning venue that hosted the Olympics in…

Read More
Tower of Light, Manchester, UK – Complex modelling using Oasys GSA

The Tower of Light is a 40-meter-tall cooling tower which supports and encloses five exhaust flues of a new Combined…

Read More
Design and analysis of the Sea Shell Aquarium roof using Oasys GSA

The Sea Shell Aquarium is the largest international standard aquarium located at Phu Quoc Island, Vietnam and is part of…

Read More
Monte Carlo simulation risk assessment of existing structures using Oasys GSA

Arup was approached to conduct a Quantitative Risk Assessment by a client who owned a large portfolio of existing buildings…

Read More
Cairo Apartments: contemporary and affordable accommodation, London

This contemporary collection of 113 studios and apartments of varying sizes and floorplans in the centre of Croydon’s Old Town provides much…

Read More
Scale and drama at Caernarfon Castle, Wales

For sheer scale and architectural drama Caernarfon Castle stands as one of the greatest buildings of the Middle Ages, with…

Read More
Superstructure steel frame with reinforced concrete basement, Chorley Youth Zone

Open when schools are closed, Chorley’s purpose-built Inspire Youth Zone is run by a community charity to provide a fun…

Read More
Venue on the Green, a hypar timber shell roof

‘Venue on the Green’ is a new youth centre in East Sussex, where an innovative, low cost and buildable hyperbolic…

Read More
Princeton University – Frick Laboratory

Arup’s multidisciplinary design for Princeton University’s new Frick Laboratory had to meet major challenges, balancing the rigorous vibration and cleanliness…

Read More
Optimisation of High-Rise Structures

In order to optimise the freeform truss façade of their high-rise structure in the early stages of the design process, Bas…

Read More
National Assembly for Wales
Structural Analysis National Assembly for Wales

The National Assembly for Wales is a multi award winning* project located in a prominent and prestigious waterfront site in…

Read More

Newsletter Sign up

Please fill out your details below to receive the latest oasys news.

  • This field is for validation purposes and should be left unchanged.